<li id="qqq8q"></li>
<li id="qqq8q"><tt id="qqq8q"></tt></li>
<tt id="qqq8q"><table id="qqq8q"></table></tt>
  • Feedback

    Navigation:Home  ? News  ?  Company News

    The equipment of Shanghai Tianma leachate treatment project was installated

    • Published: 2015-12-08 12:39:00
    • Hits: 1898

    In Nov 30th,the biogas system of Shanghai Tianma Waste Incineration Power Plants was installated,the system was contructed by our company.


    The handling capacity of Shanghai Tianma waste incineration Power plant is 2000 tons per day. According to the design requirements, our company provided the the biogas pretreatment、the wet desulfurization and the enclosed ground flare,the treatment capacity is 900Nm3/h.







    Tel:025-84414484 Fax:025-86647595 Address:Wenying Road No.3,Binjiang Development Zone Jiangning District,Nanjing City


          Copyright by Nanjing Carbon Recycle Biomass Energy Co.,Ltd.
    久久夜色精品国产噜噜麻豆,精品人无码一区二区三区,国产成人综合在线视频,免费人成在线观看网站