<li id="qqq8q"></li>
<li id="qqq8q"><tt id="qqq8q"></tt></li>
<tt id="qqq8q"><table id="qqq8q"></table></tt>
  • Feedback

    Navigation:Home  ? News  ?  Company News

    Engineering case related to coalbed methane project undertaken by Nanjing Carbon Recycle

    • Published: 2018-05-08 15:33:00
    • Hits: 1896

    The coalbed methane pretreatment system is an important link in the gas transmission and distribution system of coalbed methane power plants. The technical level of our company in the field of coalbed methane treatment has been quite mature and stable. The feedback on cooperation with many enterprise projects is also very good. It is very good in 2018. So far, the new projects are as follows:

           ---Tunlan Gas Power(second) pretreatment equipment

     

                       Rated treatment gas volume 7600Nm3/h

     

           ---Zhangji East District Gas Power Station

     

                        Rated treatment volume 4000Nm3/h

     

           ---Yuecheng Coal Mine Gas Power Plant Project

     

                        The Gas capacity is 3500Nm3/h

     

           ---Guizhou Lao Shatian Coal Mine Gas Power Plant Project

     

                        The Gas volume is 9600Nm3/h

     

    Tel:025-84414484 Fax:025-86647595 Address:Wenying Road No.3,Binjiang Development Zone Jiangning District,Nanjing City


          Copyright by Nanjing Carbon Recycle Biomass Energy Co.,Ltd.
    久久夜色精品国产噜噜麻豆,精品人无码一区二区三区,国产成人综合在线视频,免费人成在线观看网站